The McLaren Health Care Corporation is headquartered in Grand Blanc, Michigan, and operates 12 hospitals in Michigan. One of these hospitals is the McLaren Greater Lansing Replacement Hospital, a cutting-edge medical facility that stands at nine stories tall. The hospital, which opened in March 2022, is part of a $256 million project that includes a state-of-the-art cancer and ambulatory center, as well as various other healthcare facilities.
| Characteristics | Values |
|---|---|
| Number of floors | 9 |
| Square Footage | 562,000 sq. ft. |
| Number of beds | 240 |
| Cost | $256 million |
| Year of completion | 2022 |
| Location | Forest and Collins roads in Lansing, Michigan |
Explore related products
What You'll Learn

McLaren Greater Lansing Replacement Hospital is nine stories tall
The McLaren Greater Lansing Replacement Hospital is a nine-story, 562,000-square-foot structure that was completed in 2022. The $256 million project, located on a 39-acre healthcare campus at Michigan State University's Corporate Research Park, features 240 beds.
The construction of the hospital faced challenges due to tight timelines, manpower constraints, and supply chain issues. However, efficient project management and innovative construction methodologies helped overcome these obstacles. Barton Malow, the construction company, employed Lean construction practices and prefabrication methods, reducing on-site trades by 25% and accelerating construction by two months.
The hospital is designed to foster research, healthcare services, and educational opportunities. It includes a state-of-the-art cancer and ambulatory center, as well as various other healthcare facilities. The emergency department features four enclosed ambulance bays, preventing patients and EMTs from being exposed to adverse weather conditions. The ambulance bays open directly into a 42-room emergency department, which includes dedicated behavioral health beds.
The room design process at McLaren Greater Lansing Replacement Hospital was meticulous, taking three years to complete. The staff built Styrofoam models of the rooms, carefully planning the placement of equipment, outlets, vents, and critical infrastructure. This attention to detail ensures that the rooms are designed to meet all medical and patient needs without any conflicts. The hospital also features a 30-bed medical surgical unit with negative pressure rooms to handle highly contagious diseases.
Who Left Good Karma Hospital? Dr. Varma's Exit Explained
You may want to see also
Explore related products
$15.79 $23.99

Construction began in 2018 and was completed in 2022
Construction of the McLaren Greater Lansing Replacement Hospital began in 2018 and was completed in 2022. The hospital is a nine-story, 562,000-square-foot structure with 240 beds, located on a 39-acre healthcare campus at Michigan State University's Corporate Research Park. The construction project was a joint venture between Barton Malow and the Lansing-based Christman Company, who provided comprehensive construction management services for the entire campus.
To overcome challenges related to tight timelines and manpower constraints, Barton Malow employed Lean construction practices and prefabrication methods, resulting in accelerated construction and significant financial savings. Takt Time Planning was also utilised for project scheduling, ensuring schedule certainty. The construction was segmented, with one crew working from the basement to the third floor and another crew working from the fourth to the ninth floor. This approach allowed for the efficient progression of work and the completion of various parts of the hospital as other areas were still under construction.
The room design process for the hospital took three years, with staff building Styrofoam models to plan the placement of equipment, outlets, vents, and critical infrastructure. The pandemic also impacted construction, with McLaren implementing additional sanitising measures and safety protocols for workers. They also redesigned a ward to handle patients with highly contagious diseases and expanded waiting areas for social distancing.
The new hospital features four enclosed ambulance bays, which open directly into a 42-room emergency department, including dedicated behavioural health beds. The completion of the hospital in 2022 marked the end of a construction journey that began in 2018, resulting in a state-of-the-art medical facility that fosters research, healthcare services, and educational opportunities within the community.
MSW: A Must for Hospital Social Workers?
You may want to see also
Explore related products

The hospital cost $256 million to build
The McLaren Greater Lansing Replacement Hospital is a cutting-edge medical facility that cost $256 million to build. Construction began in 2018 and was completed in December 2021, with patients arriving in March 2022. The hospital stands tall at nine stories and 562,000 square feet, with 240 beds.
The construction of the hospital faced various challenges, including a tight supply chain for materials and the impact of the COVID-19 pandemic. McLaren officials had to implement additional sanitizing measures and safety protocols for workers, and they also had to redesign a ward to handle patients with highly contagious diseases and expand waiting areas for social distancing. Despite these challenges, the construction was completed ahead of schedule thanks to the adoption of Takt Time Planning and Lean construction practices, which reduced on-site trades by 25% and accelerated construction by two months.
The hospital features four enclosed ambulance bays, which open directly into a 42-room emergency department, including dedicated behavioral health beds. The room design process alone took three years, with staff building Styrofoam models to ensure that all medical and patient needs could be met without conflict. The new facility will also have a state-of-the-art cancer and ambulatory center, fostering research, healthcare services, and educational opportunities within the community.
The McLaren Greater Lansing Replacement Hospital is expected to welcome over 1,000 physicians, research professionals, and educators, solidifying its reputation as a hub for medical excellence. The hospital will replace two existing hospitals in Lansing, consolidating two different work cultures and transitioning nearly 3,000 staff members into the new facility. This move will undoubtedly bring about a dramatic change in workflow and present an immense opportunity for the growth of Greater Lansing's healthcare sector.
Community Hospital's Catholic Roots: Palos' History
You may want to see also
Explore related products

It has 240 beds and a 42-room emergency department
The McLaren Greater Lansing Replacement Hospital is a cutting-edge medical facility with 240 beds and a 42-room emergency department. This nine-story, 562,000-square-foot structure, which cost $256 million, was completed in 2022. It is located on a 39-acre healthcare campus at Michigan State University's Corporate Research Park. The hospital is a testament to McLaren's commitment to excellence in healthcare construction and innovation.
The construction of the hospital faced challenges due to tight timelines and manpower constraints. However, through the strategic use of prefabrication methods and Takt Time Planning, the project was completed efficiently, with substantial financial savings. The construction also had to adapt to the pandemic by implementing additional sanitizing measures and safety protocols for workers.
The emergency department at McLaren Greater Lansing is designed to handle various medical situations. It features four enclosed ambulance bays, protecting patients and EMTs from adverse weather conditions. The ambulance bays open directly into the 42-room emergency department, ensuring efficient patient transfer. Additionally, dedicated behavioural health beds have been incorporated into the emergency room, providing separate and specialised care.
The room design process at McLaren Greater Lansing's emergency department was meticulous and thorough. It took three years to finalise, with staff building Styrofoam models to ensure optimal placement of equipment, outlets, vents, and critical infrastructure. This attention to detail reflects McLaren's dedication to providing the best possible care to its patients and meeting all their medical needs without compromise.
Philadelphia VA Hospital: Closure or Continuation?
You may want to see also
Explore related products

The project was a joint venture between Barton Malow and the Lansing-based Christman Company
The McLaren Greater Lansing Replacement Hospital is a nine-story, 562,000-square-foot facility with 240 beds. It is located on a 39-acre healthcare campus at Michigan State University's Corporate Research Park. The project, which began construction in 2018, was a joint venture between Barton Malow and the Lansing-based Christman Company. Barton Malow employed Lean construction practices to streamline the project schedule and accelerate construction, demonstrating their commitment to efficiency and cost-effectiveness. Their adoption of Takt Time Planning played a pivotal role in achieving schedule certainty and contributed to substantial financial savings.
The joint venture between Barton Malow and the Lansing-based Christman Company was responsible for providing comprehensive construction management services for the entire Corporate Research Park Campus. This partnership welcomed over 1,000 physicians, research professionals, and educators to the new facilities, establishing McLaren Greater Lansing as a prominent hub for medical excellence.
The construction of the hospital faced challenges due to tight timelines, manpower constraints, and supply chain issues. However, Barton Malow's strategic employment of prefabrication methods resulted in a significant reduction of on-site MEP trades and accelerated construction by two months. The construction was segmented, with one crew working from the basement to the third floor and another crew working from the fourth to the ninth floor. This approach allowed for the completion of various parts of the hospital as work progressed in other areas.
The new hospital features four enclosed ambulance bays that open directly into a 42-room emergency department. McLaren also added dedicated behavioral health beds, separated from other emergency patients. The room design process was meticulous, taking three years to ensure that all medical and patient needs were met. The new facility at Forest and Collins roads in Lansing replaced two existing hospitals, consolidating McLaren's staff and fostering a melding of two distinct work cultures.
Barbertons Hospital: A Comfortable and Caring Stay
You may want to see also
Frequently asked questions
McLaren Hospital in Greater Lansing has nine floors.
The hospital opened in March 2022.
The hospital is located at Forest and Collins Roads in Lansing, Michigan.
The hospital has 240 beds.
A state-of-the-art cancer and ambulatory center, along with various other healthcare facilities, are located next to the hospital.